Vlorë & the whole county — Professional electrician · 24-hour emergency · Free site visit+355 69 483 4301

PHOTOVOLTAIC · NET METERING ≤ 500 kW

The sun pays your bill. Up to 90%.

Turnkey installation at 430–900 €/kWp, VAT included. With the business tariff at 18.26 lek/kWh, the system pays for itself in 4–7 years.

430–900 €/kWp≤ 500 kW NET METERING25-YEAR PANEL WARRANTY
Panele Diellore

01 · 01 · 2027

From 1 January 2027, Albania switches from net-metering to net-billing.

Whoever connects to the grid before the deadline keeps the current, more favourable terms. This is a regulatory fact — not a marketing trick.

And from 2026, new buildings must have solar pre-installation.

FOTOVOLTAIK

How much do you save?

15 000

Property type

Suggested system

13.5 kWp

Indicative cost

~9450 €

Yearly saving

~135 000 lek

Payback in

~7 years

Indicative estimate: ~1,400 kWh/kWp per year, 75% self-consumption, business tariff 18.26 lek/kWh. The exact quote comes after the free inspection.

Send the result on WhatsApp →

PUBLISHED PRICES

Real, published prices

SystemFor whomPrice (VAT incl.)
3 kWpapartment / small home2,400–2,700 €
5 kWpfamily home3,750–4,400 €
10 kWpvilla / small business6,500–7,800 €
20 kWphotel / restaurant11,000–13,000 €

430–900 €/kWp depending on roof, inverter and distance. Final quote after the free inspection.

Message us on WhatsApp — reply within minutes

The on-site inspection is free across Vlorë and surroundings and the price is fixed in writing before the work. Active 24 hours a day, 7 days a week — feel free to send photos of the problem.

or call us: +355 69 483 4301 · Your data is only used to contact you back — no spam.

HOW WE WORK

From the phone call to the kilowatts

1. Free inspection & measurements

We come to you, measure the roof, orientation and your real consumption from the bills.

2. Design & fixed quote

We size the system and give you the final price — no "estimates" that grow later.

3. Installation 2–5 days

Panels, inverter and protections fitted by our team — clean and safe work.

4. Grid connection & net-metering

We handle the OSHEE paperwork through to activation of the compensation scheme.

NET METERING

How net-metering works

During the day the panels produce energy you consume directly — water heater, air conditioners and ovens run on sunshine, not on the grid.

Surpluses are sold to the grid and offset against evening and winter consumption. Net-metering (up to 500 kW) makes this exchange 1:1.

With the business tariff at 18.26 lek/kWh, every self-produced kilowatt is a full saving — that's why the ROI for hotels and restaurants is so strong.

produces
consumes
sells the surplus
For hotels & restaurants

B2B

For hotels & restaurants

Tourist season = peak consumption in the sunniest hours. A 20 kWp system covers the AC and water-heater peak exactly when the bill explodes. Combine it with a maintenance contract and your property's energy becomes a predictable cost.

B2B contact →

FREQUENT QUESTIONS

Solar questions

Is solar worth it in Albania in 2026?
Yes — the Riviera gets over 300 sunny days a year and ~1,400 kWh/kWp of production. At current energy prices, especially for businesses at 18.26 lek/kWh, payback is 4–7 years for a system that lasts 25+ years.
How many kWp does a home need?
A typical family with a 6,000–10,000 lek/month bill needs 3–5 kWp. We do the exact calculation from your real bills during the free inspection.
What changes on 1 January 2027?
Albania moves from net-metering (1:1 energy compensation) to net-billing (surplus paid at a lower rate). Whoever connects before the deadline keeps the current, more favourable terms — a documented regulatory change, not a sales tactic.
How long does installation take?
The physical installation takes 2–5 days depending on size. The OSHEE grid-connection procedure takes several weeks — which is why starting early ahead of the 2027 deadline matters.
Does it work on pitched tile roofs?
Yes — we have mounting systems for tile roofs, flat concrete slabs and even yards (ground structures). South-facing is ideal, but south-east/south-west only loses 5–10%.
What warranty does the system have?
Panels: 25-year production warranty (80%+). Inverter: 5–10 years depending on brand. Our installation: 2-year workmanship warranty, with optional yearly maintenance.
Do you handle the grid paperwork?
Yes — the OSHEE application, technical documentation, bidirectional meter connection and net-metering activation are done by us, included in the quote.
Do you do panel maintenance and cleaning?
Yes — cleaning 1–2 times a year and a yearly check keep production at its peak. Sea salt and dust on the coast make maintenance especially important.

Have an electrical problem — or a project?

+355 69 483 4301
WhatsApp
Call Now WhatsApp